Ground improvement methodのメーカーや取扱い企業、製品情報、参考価格、ランキングをまとめています。
イプロスは、 製造業 BtoB における情報を集めた国内最大級の技術データベースサイトです。

Ground improvement method×尾鍋組 - メーカー・企業と製品の一覧

Ground improvement methodの製品一覧

1~4 件を表示 / 全 4 件

表示件数

4,171 successful hires! Ground improvement methods that protect land value.

No artificial materials left underground! Achieve improved strength, liquefaction countermeasures, and asset value protection with ground improvement using natural stones!

The "Eco-Geo Method" is a ground improvement technology that uses only crushed natural stone, without the use of cement or steel pipes. To ensure consistently stable quality and strength, it features the use of a uniquely developed EG casing (a cylindrical device) that is not used in other crushed stone methods. 1. Contributes to the preservation of the global environment 2. Protects land value 3. Strength does not degrade 4. Measures against liquefaction during earthquakes 5. Two types available: with and without soil removal 【Achievements and Adoption Numbers (as of March 2024)】 ■ Construction agencies: 58 locations ■ Housing companies that have adopted it: 4,171 companies ■ Total number of constructions: 34,449 cases *For more details, please download the PDF or feel free to contact us.

  • Other contract services

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Contributing to a clean site: Zero waste and zero leftover soil ground improvement method.

Introduction to the Eco-GEO Method (Standard Type) and Eco-GEO ZERO Method (No Soil Disposal Type)!

We would like to introduce our residential crushed stone ground improvement work, "Eco-GEO Method." With the Eco-GEO Method (standard type), no waste (such as empty cement bags or cut steel pipes) is generated during construction, and no artificial materials are left underground. Furthermore, with the Eco-GEO ZERO Method (no soil disposal type), no surplus soil is generated during excavation, allowing us to achieve zero "waste and surplus soil" from construction through to the future. 【Methods】 ■ Eco-GEO Method (standard type) ■ Eco-GEO ZERO Method (no soil disposal type) *For more details, please download the PDF or feel free to contact us.

  • Other contract services

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Cost reduction: Ground improvement method with a shorter design length than conventional method support piles.

The design length is shorter than that of general solid piles! Compared to other methods, it may also reduce the overall construction cost.

The Eco-GEO method is a replacement method rather than a support pile method. The weight supported by the "crushed stone reinforcement body" is dispersed underground, so it does not require a solid foundation at the tip, and in many cases, the design length is shorter than that of conventional solid piles. Therefore, depending on the ground conditions, it may be possible to reduce the overall construction cost compared to other methods. 【Features】 ■ Supports the weight of the building with both the "crushed stone reinforcement body" and the "original ground" ■ Does not require a solid foundation at the tip ■ In many cases, the design length is shorter than that of conventional solid piles ■ Depending on the ground conditions, it may be possible to reduce the overall construction cost compared to other methods *For more details, please download the PDF or feel free to contact us.

  • Other contract services

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Ground improvement method that can reduce the burden on site managers and contribute to shortening construction periods.

Quality control is completed simultaneously with the completion of construction! There is no need to wait for the confirmation of the strength of the test pieces.

We would like to introduce our residential crushed stone ground improvement work, "Eco Geo Method." Since there is no need for a curing period, the construction time can be shortened. No water is used in the construction. Because the material is crushed stone, there is no need for level management of the pile heads. Additionally, there is no worry about damaging the pile heads during foundation excavation. 【Features】 ■ No curing period required ■ Construction possible without water ■ No post-testing (test pieces) required ■ No level management of pile heads needed *For more details, please download the PDF or feel free to contact us.

  • Other contract services

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録